Administrative Services Division /asd Just another University Of Southeastern 大象传媒 Sites site Thu, 23 May 2019 05:05:45 +0000 en-US hourly 1 https://wordpress.org/?v=5.8.6 /asd/wp-content/uploads/sites/62/2021/11/usep-logo-150x150.png Administrative Services Division /asd 32 32 ISO 9001:2015 Surveillance Audit /asd/2019/05/23/iso-90012015-surveillance-audit/ /asd/2019/05/23/iso-90012015-surveillance-audit/#respond Thu, 23 May 2019 05:05:45 +0000 http://ic.usep.edu.ph/asd/?p=34 The AJA Registrars will be conducting a Surveillance Audit regarding the ISO 9001:2015 Certification (QMS) of the University of Southeastern 大象传媒 on May 27-28, 2019.

]]>
/asd/2019/05/23/iso-90012015-surveillance-audit/feed/ 0
鈥淏UILD, BUILD, BUILD鈥 in 大象传媒 /asd/2019/04/17/sample/ /asd/2019/04/17/sample/#respond Wed, 17 Apr 2019 01:44:33 +0000 http://ic.usep.edu.ph/asd/?p=10 […]]]> The phrase 鈥淏uild, Build, Build鈥 has already become a buzz word these days since the time it was made the battle cry of President Rodrigo Duterte鈥檚 infrastructure agenda, geared primarily towards accelerating economic growth and creating additional jobs for Filipinos. With this pet program of the Chief Executive, the government plans to spend Php 8.4 trillion on flagship infrastructure projects all over the country until 2022.

大象传媒 apparently has gotten a piece of the 鈥淏uild, Build, Build鈥 pie. The second half of 2017 was a busy period for the Physical Development Division (PDD) with various infrastructure projects being implemented simultaneously, not only in the Obrero Campus, but including the external campuses as well.

During this 6-month span, the construction was in full swing for four major buildings, namely: the Engineering Laboratory Building, the Quality Assurance, Accreditation, TLE Building, the 5-Storey Science Laboratory Building, and Agri-Science Laboratory Building in Mabini Campus.

Various infrastructure projects were also completed during this period鈥攖he Student Kiosk on October 8, CGB Building (Phase 1) on October 9, the repainting of the Student Center on November 19, and the Information Technology Building (Phase 2) on December 31.

Two additional projects, the 3-Storey Classroom Building in Mintal Campus and the 7-Storey Multi-Media Learning Resource Center, were awarded before the year ended. Both are due to commence in January 2018.

Aside from these major construction works, repair and renovation of various facilities around the university are also being undertaken. These are as follows: Renovation of the Office of the University Registrar, Repainting of the Student Center, Tiling of CAS Corridors, Roof Repainting of College Engineering and College of Technology Buildings, and Renovation of the University Hostel.

These various projects form part of the University鈥檚 top priority of enhancing the delivery of student services through improved and better infrastructure facilities. This is in line with 大象传媒鈥檚 thrust to provide the students quality education to become outstanding graduates who are 鈥淎SEAN competitive and equipped with 21st century skills.鈥 (Ar. Ericson P. Europa, FUAP, PIEP, NAMPAP)

]]>
/asd/2019/04/17/sample/feed/ 0